The brief

What Murphy Group needed

National Grid’s £113 million Emission Reduction Project needed on-site security during the re-commissioning of two compressor stations in Cambridgeshire, at Peterborough and Huntingdon. The programme started in 2017 and was due to finish in 2021. COVID and a change of contractor part-way through extended it to May 2024.

A live re-commissioning programme on operational energy infrastructure means constant contractor movement and entry points that change from week to week. Security had to hold on a site that would not stand still.

Our response

What we did for Murphy Group

We partnered with a site-security technology specialist to provide around-the-clock, high-resilience cover at both stations. Sixteen security officers covered the sites 24 hours a day, with two security supervisors across Peterborough and Huntingdon.

With our officers on site, supported by surveillance and access technology, we established strict control over a site facing regularly changing entry and exit points and heavy contractor access.

We stayed for seven years, working with several large contractors including Costain, Murphy Group and National Gas. The security team stayed consistent through each change, and many officers remained until the project finished. Over that period we delivered more than 240,000 hours of security cover across the two stations — a continuous presence for the length of the programme, not a series of short deployments. That length of tenure is the point: officers who have worked a site for years know which access route is being used this month and who should be on it.

Outcome

What changed for Murphy Group

We implemented a defence-in-depth strategy, with layered measures delivering the level of security required to protect the client’s assets.

The engagement ran for seven years and more than 240,000 hours of cover, spanning the full re-commissioning programme at both stations.

The Peterborough security supervisor stayed to the end and worked the very last shift on Friday 24 May 2024.

An Ashridge Group officer holding a five-year long service award at the compressor station gate
An Ashridge officer with a five-year long service award at the compressor station, October 2020.

Facing something similar? Get a candid view within one working day.

Questions about this engagement

Seven years, delivering more than 240,000 hours of security cover across the Peterborough and Huntingdon compressor stations, as part of National Grid’s £113 million Emission Reduction Project. We worked with several contractors, including Costain and Murphy Group, from 2017 until the final shift on 24 May 2024. That length of tenure is the point: officers who have worked a site for years know which access route is in use this month and who should be on it.

A live re-commissioning programme on operational energy infrastructure means constant contractor movement and entry points that change from week to week. Security had to hold on a site that would not stand still, which is a different problem from securing a fixed perimeter.

A defence-in-depth strategy — layered measures rather than a single line of control. Our officers on site were supported by surveillance and access technology provided with a site-security technology specialist, giving strict control over a site facing regularly changing entry and exit points and heavy contractor access.

Reviewed by , Group Managing Director. Published · updated .

Ashridge Group is SIA ACS approved and holds ISO 9001, ISO 14001 and ISO 45001 accreditation. See all our accreditations

Related work

More security case studies

All security case studies

Similar requirement?

Tell us about your site.

We’ll give you a candid view on whether and how we can help — within one working day.