What we did for UK Power Networks
Our first job was to liaise with the main energy providers to establish the existence and location of the faulty meters. Collecting and corroborating information for over 24,000 addresses was no easy task – customer data was old and often incomplete and some premises no longer existed.
We then sent out a team of agents to the properties to encourage occupants to make an appointment to have their meter removed or replaced. Our agents often had to make multiple visits in order to speak with the occupant and we continued to work with the utility companies to update the address list and verify successful visits. Many addresses had nobody in during the day or on weekdays, so we scheduled visits around the people who lived and worked there.
Every agent completed an intensive two-day training programme we designed for the project. It covered data security and compliance, the warrant process, difficult conversations, de-escalation, and identifying and caring for vulnerable people. Agents carried picture cards of a fire-damaged meter to show occupants why the removal mattered, and the team included signers, so communication difficulties could be overcome on the doorstep.
Some occupants refused entry or threatened agents with verbal or physical violence. Where an occupant refused removal, our legal representative applied to the court for a Warrant of Execution. We then co-ordinated a joint visit with an agent, a locksmith, a UKPN engineer and a supplier engineer, adding an animal handler if we knew there was a dog at the property.