The brief

What UK Power Networks needed

In 2014 UK Power Networks (UKPN) asked Ashridge Group to undertake a critical project on their behalf. The Health & Safety Executive had issued them with a notice to remove faulty meters from over 24,000 residential and commercial properties in their network area across London, East Anglia and the South. The faulty meters had caused several incidents including a couple of residential fires and their removal was urgently required to avoid further threat to property and life.

A large-scale project of this kind had never been carried out before and UKPN wanted us to work with them to plan, implement and manage the process.

Our response

What we did for UK Power Networks

Our first job was to liaise with the main energy providers to establish the existence and location of the faulty meters. Collecting and corroborating information for over 24,000 addresses was no easy task – customer data was old and often incomplete and some premises no longer existed.

We then sent out a team of agents to the properties to encourage occupants to make an appointment to have their meter removed or replaced. Our agents often had to make multiple visits in order to speak with the occupant and we continued to work with the utility companies to update the address list and verify successful visits. Many addresses had nobody in during the day or on weekdays, so we scheduled visits around the people who lived and worked there.

Every agent completed an intensive two-day training programme we designed for the project. It covered data security and compliance, the warrant process, difficult conversations, de-escalation, and identifying and caring for vulnerable people. Agents carried picture cards of a fire-damaged meter to show occupants why the removal mattered, and the team included signers, so communication difficulties could be overcome on the doorstep.

Some occupants refused entry or threatened agents with verbal or physical violence. Where an occupant refused removal, our legal representative applied to the court for a Warrant of Execution. We then co-ordinated a joint visit with an agent, a locksmith, a UKPN engineer and a supplier engineer, adding an animal handler if we knew there was a dog at the property.

Outcome

What changed for UK Power Networks

Speed was an important aspect of the project as the faulty meters needed to be removed as soon as possible. After each home visit, our agents on the ground immediately compiled a report and sent it via Smart device direct to Ashridge Group HQ, where a team of specially recruited admin staff collated and shared the data with key stakeholders.

Our agents visited a total of 24,150 properties during the eight-month project. Only 1.97% of addresses were transitioned to warrant – all of which were successful.

At the completion of the project UKPN were able to report a 100% success rate to HSE.

Since then we have carried out similar projects for UKPN at a further 7,700 locations.

The meter programme was one part of a wider relationship. We have worked with UKPN since 2012, including security at electrical substations and commercial yards, with an average of four hours from call to officer on site and a fastest response of 52 minutes. We have also worked alongside Engie, UKPN’s facilities management provider.

Facing something similar? Get a candid view within one working day.

Certainly, a supplier of choice for me. Highly professional supplier with boundless subject matter expertise and a real service partner in every sense of the word.

— Andrew Mack, Operations Director (UKPN), Engie Workplace Ltd

Questions about this engagement

24,150 properties visited in eight months, across London, East Anglia and the South. The programme followed a Health and Safety Executive order to remove faulty meters. UK Power Networks reported a 100% success rate to the HSE on completion. It remains the largest single visiting programme we have planned and delivered.

Yes. The UKPN work was a planned programme rather than a guarding contract: routing, scheduling, resourcing and reporting across three regions to a regulator-driven deadline. Programmes of that kind depend as much on the planning and the reporting line as on the people knocking on doors.

Where a regulator has ordered the work, the reporting is the deliverable as much as the visits are. UK Power Networks had to report completion to the Health and Safety Executive, and reported a 100% success rate. That figure only exists because every visit, refusal and revisit was recorded as it happened.

Agents were trained to explain the risk, using picture cards of a fire-damaged meter, and most occupants agreed. Where someone still refused, our legal representative applied to the court for a Warrant of Execution, and we co-ordinated a joint visit with a locksmith, a UKPN engineer and a supplier engineer. 1.97% of addresses went to warrant, and all of those were successful.

Reviewed by , Group Managing Director. Published · updated .

Ashridge Group is SIA ACS approved and holds ISO 9001, ISO 14001 and ISO 45001 accreditation. See all our accreditations

Related work

More security case studies

All security case studies

Similar requirement?

Tell us about your site.

We’ll give you a candid view on whether and how we can help — within one working day.