Waking Watch
Residential · Westminster, London SW1
Encore Group needed continuous waking watch across six residential blocks in Westminster after the building’s Fire Risk Assessment identified an interim need for patrols. We had officers on site within four hours and ran two per shift, 24 hours a day, for eight months until permanent…
Read case study
Waking Watch
Residential · Rotherhithe, London SE16
Pageant Steps needed waking watch across three riverside blocks on Rotherhithe Street while the fire alarm system was upgraded throughout. One block, Calder Court, is a Higher-Risk Building under the Building Safety Act 2022. We mobilised within four hours and staffed two officers on days and…
Read case study
Waking Watch
Residential · Spitalfields, London E1
Encore Group needed continuous waking watch across Bishop’s Court, a three-block residential development in Spitalfields, after its Fire Risk Assessment identified an interim need for patrols. We have provided one fire-trained officer per shift, 24 hours a day, since December 2025, on a contract planned to…
Read case study
Waking Watch
Residential (mixed-use) · St Paul’s Square, Birmingham B3
St Paul’s Place at 40 St Paul’s Square is a historic Birmingham factory converted to mixed use, with private apartments and penthouses on its upper floors. Centrick needed waking watch while remedial works were carried out. We have staffed one officer on days and one on…
Read case study
Waking Watch
Residential · Dickens Heath, Solihull B90
Centrick needed interim fire cover at Waterside Heights, a premium apartment building in Dickens Heath Village near Solihull, while its L5 fire alarm system was decommissioned. We staffed two officers on days and two on nights for the eight days the system was out of use.
Read case study
Waking Watch
Residential · Walsall, West Midlands WS1
When faults developed in the fire alarm system at Burlington Gate in Walsall, Encore Group needed interim fire cover while they were put right. We provided one fire-trained waking watch officer on site 24 hours a day for ten days, standing down on 26 June 2026…
Read case study