The brief

What the A14 scheme needed

The A14 Cambridge to Huntingdon improvement scheme had been running for 18 months when the A14 Integrated Delivery Team asked us to take over security. The incumbent security contractor had failed, and the team needed a new security partner urgently. We had worked with them on previous projects, and they trusted us to get the contract back on track.

When we took over in June 2019 it was the largest construction scheme in the UK. The £1.5 billion project, led by Highways England (now National Highways), upgraded 21 miles of the A14 and added a new 12-mile bypass, new local access roads and improvements to Huntingdon town centre.

Fourteen fixed and moveable compounds needed 24/7 manned guarding, CCTV and a roaming response team to protect staff, construction workers, plant and machinery. We delivered this with a security technology partner as part of the A14 Integrated Delivery Team.

Map of the A14 Cambridge to Huntingdon scheme from Ellington to Cambridge, showing the 21 upgraded miles of the A14, the new 12-mile bypass and the fixed and moveable compounds
The route: fixed and moveable compounds ran the length of the scheme, from Ellington to Cambridge. Illustrative, not to scale.
Our response

What we did for the A14 scheme

Taking on the existing team. Under TUPE we took on the existing team of 44 officers. A dedicated project manager led the takeover, with admin staff from our head office supporting them, and every officer was re-inducted during a one-month live mobilisation with no gap in cover.

Screening and vetting. We could not confirm that the team had been properly screened, so we screened and vetted every officer again.

Training to our standard. The team had not been following correct procedures. We took each officer through the site’s assignment instructions, using flow charts and diagrams, and talked through security scenarios so they were ready for what the site could throw at them.

Holding the line on quality. After induction, training and assessment, not every officer met our standard. Those who did not were taken off the contract through the proper HR procedures.

Two Ashridge Group officers in hi-vis in the site office on the A14 Cambridge to Huntingdon scheme
Ashridge Group officers in the site office on the A14 Cambridge to Huntingdon scheme.
Ashridge Group officer in hi-vis holding a long service award certificate in the A14 site office
A long service award for one of our officers, in the A14 site office.
Outcome

What changed for the A14 scheme

Compounds and route covered. Officers guarded the fixed compounds, where the offices and accommodation were. Mobile response teams patrolled the whole route to protect high-value plant at the moveable compounds and keep the area clear of anyone unauthorised. Fixed and moveable CCTV at the compounds and along the A14 was monitored by a remote video response centre, so alarms were verified and responded to quickly.

Moving with the work. As compounds moved, we moved with them. Regular security and risk assessments decided where patrols increased and where CCTV was moved or added after suspicious activity. Each time a compound moved, we reassessed the officers and CCTV it needed and recommended cost savings to the client.

Working with the police. Our officers reported suspicious activity to the police and carried out joint patrols with them.

On a live road. When road traffic accidents happened on the route, our officers called the emergency services quickly and gave assistance.

Ashridge Group officer in hi-vis and a hard hat at a desk in the A14 site office
One of our officers in the A14 site office, May 2020.
Ashridge Group officer in hi-vis holding an Ashridge thank-you card in the A14 project office
One of our officers in the A14 project office with an Ashridge thank-you card.

Facing something similar? Get a candid view within one working day.

Where the security world as a whole still has far too many bad apples, Ashridge Group is a good model with good people and with continued development you can go from strength to strength.

— Pat Callan, Operational Facilities Manager, A14 Integrated Delivery Team

Questions about this engagement

Yes. We took over security on the A14 Cambridge to Huntingdon scheme 18 months in, after the incumbent contractor failed. We took on the existing 44 officers under TUPE and mobilised over one month while the 14 compounds stayed guarded 24/7, with no gap in cover.

Under TUPE, they transfer to us. On the A14 we re-inducted all 44 officers, screened and vetted each one again because earlier screening could not be confirmed, and retrained them on the site’s assignment instructions. Officers who did not meet our standard after assessment left the contract through the proper HR procedures.

A construction site changes shape continuously. Compounds move, plant and materials arrive and leave, and the people on site change week by week. Security has to track the works rather than hold a fixed perimeter, which is why compound counts and access points matter more than headcount alone.

Reviewed by , Group Managing Director. Published · updated .

Ashridge Group is SIA ACS approved and holds ISO 9001, ISO 14001 and ISO 45001 accreditation. See all our accreditations

Related work

More security case studies

All security case studies

Similar requirement?

Tell us about your site.

We’ll give you a candid view on whether and how we can help — within one working day.